Crossmount Treated Water Pumphouse

  • Highlights: Treated Water Pumphouse
  • Location: Village of Crossmount  
  • Owner: Village of Crossmount        
  • Architect: N/A                   
  • Mechanical Engineer: Bullée Consulting Ltd.
  • General Contractor: Balon Construction
  • Mechanical Contract Value: $260,000

---------------------------------------------------------------------------------------------

The Village of Crossmount has developed a dedicated treated water pumphouse to supply clean water to village’s homes and buildings. Interwest Mechanical completed the mechanical components of the building. This included a chemical treatment system, three vertical turbine pumps, and a piping system that connected the building’s reservoir to the village’s distribution system.